Usitall's mother company Tekniska Verken has established four waste-to-energy plants in the region from green field to financial close. The experience gained during the development of these waste-to-energy plants is channelled through Usitall in order to realise waste-to-energy projects on our target markets in Central and Eastern Europe.

CHP1

CHP1 is an abreviation for Combined Heat & Power plant 1. This plant was established in 1964 and since then it has been retrofitted and overhauled in stages. The plant now holds three separate biolers. The main fuel is wood and waste wood.

More info

CHP50

Combined Heat & Power plant 50 was established in 1981 and was one of the first plants in Sweden to use household and industrial waste as fuel for the production of heat and electricity. Recent retrofitting (2008) has improved performance and efficiency to new levels.

More info

CHP60

Combined Heat & Power plant 60 was commissioned in 2005 and together with CHP50 it constitutes the base of the energy production in Linköping. Both heat and power is produced using waste as the fuel. CHP60 has advanced flue gas condensation which facilitates extremely high efficiency levels.

More info

PC Väster

PC Väster or PannCentral Väster translates to Boiler house west. It was initially erected in 1983 and then the fuel was oil and coal. Today after recent investments the plant now uses wood and waste wood to fuel the city of Katrineholm, approximately 100kms due west of Stockholm.

More info

CHP1 Back to top
Commission year 1964 (line 1&3) 1971 (line 2)
Line 1&3 retrofitted 1985
Capacity Line 1: 96'000 tons/year
Line 2: 160'000 m³/year
Line 3: 240'000 tons/year
Lines 3
Fuel * Line 1: Coal (14'000 tons/year) + Rubber (13'000 tons/year)**
Line 2: Oil (4'300 m3/year) + Bio-oil (600 m3/year)**
Line 3: Waste wood (178'000 tons/year) + wood chips (5'500 tons/year) + Residuals from forrest industry (1'200 tons/year)
Calorific value Line 1: ~28MJ/kg
Line 2: ~42MJ/kg
Line 3: 8-15MJ/kg
Boiler manufacturer Line 1: SMV Svenska Maskinverken
Line 2: SMV
Line 3: SMV
Boiler type Line 1: Spreader stoaker, moving grate
Line 2: Oil fired boiler
Line 3: Moving grate
Effect CHP 77MWe & 240MWth
Steam data 475°C & 67bar
Flue gas cleaning Line 1: Flue gas return, SNCR, Cyclone, Lime & Bagfilter
Line 2: Flue gas return, SNCR, Cyclone
Line 3: Flue gas return, SNCR, Cyclone, Electro filter & Scrubber with condensing flue gas cooler
Investment Fully depriciated, investment costs irrelivent
Customers Operational from Sept/Oct to Apr/May, supplies the city of Linköpings district heating and district cooling grids.
Industrial steam for regional dairy factory and slaughter house (supply line currently closed)

* Figures from 2008
** Peak load

CHP50 Back to top
Commission year 1981
Line 2&3 retrofitted 2006, line 1 retrofitted 2008
Capacity Line 1: 55'000 tons/year
Line 2: 83'000 tons/year
Line 3: 83'000 tons/year
Lines 3
Fuel * Line 1: MSW + ISW (X tons/year)
Line 2: MSW + ISW (Y tons/year)
Line 3: MSW + ISW (Z tons/year)
Calorific value 8-15MJ/kg
Boiler manufacturer Line 1: Vonroll (1981), retrofitted 1993 Generator boiler and 2008 Vølund grate
Line 2: Vonroll (1981), new boiler 2006 Vølund
Line 3: Vonroll (1981), new boiler 2006 Vølund
Boiler type Line 1: Moving grate
Line 2: Moving grate
Line 3: Moving grate
Effect CHP 75MWth
Previously combined cycle gas and steam turbine
Currently retrofitting in progress with four new low preassure turbines
Steam data 207°C & 17bar
Flue gas cleaning All lines: SNCR, Bagfilter, Venturi Scrubber & Dioxin filter
Investment Retrofitting 2006: M€ 35
Retrofitting 2008: M€ 3
Customers Base load plant for the city of Linköpings district heating and district cooling grids

* Figures from 2008

CHP60 Back to top
Commission year 2005
Capacity 190'000 tons/year
Lines 1
Fuel * Municipal Solid Waste (x tons)
Industrial Solid Waste (y tons)
Hazardous waste (z tons)
Calorific value 8-15MJ/kg
Boiler manufacturer Vølund
Boiler type Moving grate
Effect CHP 19MWe & 68MWth
Steam data 400°C & 40bar
Flue gas cleaning SNCR, Bagfilter, Pack Bed Scrubber & Stripper
Investment M€ 80
Customers Base load plant for the city of Linköpings district heating and district cooling grids.
Process heat for regional biogas production plant. In 2008 Svensk Biogas produced 7 milj Nm³ biomethane which effectively reduced CO² emissions in Linköping with 17'000 tons

* Figures from 2008

PC Väster Back to top
Commission year 2007
Capacity 70'000 tons/year
Lines 1
Fuel * Waste wood
Calorific value 18-22MJ/kg
Boiler manufacturer KMW Energi AB
Boiler type Moving grate
Effect CHP 5MWe & 19MWth
Steam data 400°C & 40bar
Flue gas cleaning SNCR & Bagfilter
Investment M€ 18
Customers Base load plant for the city of Katrineholms district heating grid.
Process heat for local industry

* Figures from 2008